|
MSK
Cancer Center
Interventional
Operating Room Platform
New
York, NY
New
Construction of 21 state of the art Operating Rooms. This is a super
clean construction floor; maintaining a minimum of 22 air changes
per hour and a triple redundancy emergency back up power system
in addition to normal critical care systems. Each operating room
within the facility calls for the constant supply of 9 medical gasses
to each.
The
floor also includes the new construction of a Post Anesthesia Care
Unit and two HDR lead rooms for robotic High Density Radiation treatments
for severe cancer patients as well as Brain Lab neuro-units.
A
separate maintenance floor includes the mechanical room that controlls
all aspects of the systems running on 6th floor.
Client:
Memorial Sloan Kettering Cancer Center
<<back
|